Though the poverty figures of the sample survey conducted by the NSSO in its 55th round amount to only 9.38% in rural and 20.27% in urban areas, the 1997 BPL census conducted by the Rural Development Department shows that it is 36.58% in rural areas and 27.8% as per the urban survey conducted by department of Urban Affairs. Interestingly the Community Based Organization of Poor created by the Kudumbashree has a membership of 32, 10,440 families. Absolute poverty, which has been the focus of attention in India, is closely linked to “simple unemployment”. From the proposition that “simple unemployment” in the state is seriously underestimated, it would follow that the magnitude of absolute poverty too is underestimated.

According to the Planning Commission’s estimate, the rural poverty ratio in Kerala went down from 25.73 percent in 1993-94 to a mere 9.4 percent in 1999-2000. But while rural poverty is officially defined in terms of a calorie norm of 2400 per person per day, these poverty percentages do not actually refer to the population falling below this norm on the two dates. They refer to the population below a “poverty line”. This “line” corresponded to the level of expenditure at which a person got 2400 calories per day in the base year, and is updated for every subsequent year by using the Consumer Price Index for Agricultural Labourers. There would be no problem with the use of this “poverty line” if it was the case that those on this line on any date were actually accessing at least 2400 calories per person per day. But the amount of calories accessed in Kerala at the “poverty lines” corresponding to the two dates mentioned above was only 1526 and 1440 respectively.

Although poverty did reduce between 1993-94 and 2004-05 the pace of poverty reduction was lower than in the previous two decades. Taking the rural and urban together, the pace of poverty reduction fell from 1.1 percent point per annum during 1973-88 to only 0.6 percent point per annum during 1987-1993 and 0.7 percent point per annum during 1993-2005. The 61st round should, therefore, set at rest all claims that economic reforms have led to faster poverty reduction.

The rather strange upshot from the various available NSS data sets used together with official price deflators is that while the period from 1989-90 to 1998 saw insignificant rural poverty reduction despite fairly high growth in measured agricultural GDP, the period after 1999-2000 is associated with significant rural poverty reduction despite stagnant agricultural growth. In conjunction with the fact that the 61st round results reported show that the annual rate of urban poverty reduction nearly halved in the period 1993-05 as compared to 1983-94, although GDP growth accelerated, there is a general indication of disassociation between GDP growth and poverty reduction in the post reform period.

Gender differences in average income from employment were very prominent. While women employees earned Rs.1185, 1146 and 3570 respectively in Primary, Secondary and Tertiary sectors, the male employees earned Rs.2560, 3510and 4216 respectively.

New Strategy of Poverty Reduction
The failure of anti-poverty programmes in the past can be attributed to the fixation of target, lack of involvement of beneficiaries, absence of poor understanding of poverty and its causes and manifestations, the top down approach and the over dependence of bureaucracy. Kerala is seeking to achieve a breakthrough in participatory poverty reduction through Kudumbashree, which is implemented by the State Poverty Eradication Mission through the local governments. All urban local governments and Village Panchayats have been included under Kudumbashree.

Kudumbashree Programmes in Rural Areas
State Poverty Eradication Mission implements this Programme by organizing the poor by creating community based structures of women below poverty line with focus on self help, demand – led convergence of available services and resources under the leadership of the Local Governments. The key components of the programmes are:

Enabling certain minimum needs infrastructure, setting up of micro enterprises and capacity building of the poor.
Providing high quality support services for the design and implementation of self-employment ventures.
Setting up of Challenge Fund to support pro – poor policies of the Local Governments, a Technology fund to support transfer of technology relevant for poverty reduction, an Innovation fund to support path breaking innovations in poverty reduction and a common revolving fund to provide seed capital for micro enterprises.
Expansion of Asraya:- Destitute Identification Rehabilitation and Monitoring Project was launched during 2002-03 in 101 Grama Panchayats and later expanded to all grama panchayaths.
Generating jobs for educated youth.
Special schools for physically and mentally challenged.
Conduct an evaluation study on Kudumbashree.

Community Based Organizations for the Poor
The Kudumbashree programme covered the entire rural area in the state formed 168157 NHGs, 15832 ADS and 999 CDS. Community Based Organizations, which has coverage of 3243395 families, mobilized a sum of Rs. 8480312526 crores as thrift fund and disbursed credit to the tune of Rs.21861166334 crores to its members. The Panchayat functionaries and CDS/ADS Office bearers were trained utilizing the plan funds for strengthening the CBOs. [District wise details are shown in Table – 1)]

Table - 1
Community Based Organisation status in Rural Areas as on 30-9-2007
   
Cumulative
Sl.No. District
No. of
GPs
Total
NHGs
Families
Covered (nos)
Thrift (Rs)
Loans (Rs)
1 Thiruvanathapuram
78
16744
344225
850594016
1564975560
2 Kollam
71
12142
223550
607194518
1343712615
3 Pathanamthitta
54
6486
137905
310192633
621871568
4 Alappuzha
73
13075
261392
668587696
1548119353
5 Kottayam
75
10736
219213
509588988
986516549
6 Idukki
52
9119
163068
534761589
1335061139
7 Ernakulam
88
12810
215610
548036114
1599016580
8 Thrissur
92
15602
283764
803075217
3050405655
9 Palakkad
91
19827
337440
889825804
2379530237
10 Malappuram
102
13756
314538
677342852
1019477838
11 Kozhikkode
78
14127
289676
895472475
2225716344
12 Wayanad
25
7316
120248
276614608
1050405750
13 Kannur
81
10882
212744
582973941
1842797332
14 Kasargode
39
5535
120022
326052075
1293559814
 Total
999
168157
3243395
8480312526
21861166334
Source: Kudumbashree, Government of Kerala
Note: Tribal NHGs are separately tracked, these are not reflected in the District wise data.
     

Linkage Banking
The Linkage Banking Programme was launched during 2002-2003 after proper grading the NHGs as per NABARD norms. During 2002 - 03, and up to 31st October 2007, 108562 were graded and 86805 NHGs were linked with banks. A sum of Rs.48385.98lakhs has been made available to the NHGs as loan.  [Refer Table - 2)

Table - 2
District wise details of Linkage Banking as on 30-09-2007
Cumulative
Sl. No. Name of District
NHGs linked
Amount (Rs Lakh)
1 Thiruvanathapuram
9632
3747.59
2 Kollam
8575
6319.31
3 Pathanamthitta
2622
2745.35
4 Alappuzha
9991
5656.57
5 Kottayam
3942
2718.06
6 Idukki
4276
2982.02
7 Ernakulam
7423
3059.78
8 Thrissur
6980
4075.22
9 Palakkad
10580
4558.93
10 Malappuram
4564
1849.78
11 Kozhikkode
6409
3949.71
12 Wayanad
4584
3636.26
13 Kannur
4386
1727.62
14 Kasaragode
2841
1359.78
  Total
86805
48385.98
Source: Kudumbashree Government of Kerala
Note: In case of the second and subsequent linkages of the NHGs,only the amount is accounted.

Lease Land Farming
The Lease Land Farming programme, initiated in the rural areas during the year 2002-03, has been successfully extended to 820 Grama Panchayats. In these Panchayats 27316 NHGs consisting of 223779 families have participated in the programme.  During the year 2006-07, through this programme 46782.36 Acres of land has been brought under cultivation   [Refer Table - 3)

Table - 3
District wise details of Lease Land Farming as on 31-10-2007
Sl.
No.
Name of District

No. of GPs

No. of NHGs
No. of families
Area in Acres
1

Thiruvanathapuram

73
2019
21159
2624.38
2

Kollam

69
1324
5009
2716.63
3

Pathanamthitta

38
349
16119
2002.31
4

Alappuzha

72
1044
10997
2094.20
5

Kottayam

65
798
7492
1813.25
6

Idukki

49
6616
54141
7289.00
7

Ernakulam

52
3044
29949
7960.95
8

Thrissur

32
510
4459
678.63
9

Palakkad

87
2369
17906
4920.45
10

Malappuram

72
2226
9202
2619.00
11

Kozhikkode

77
2090
13284
2268.50
12

Wayanad

25
1316
1814
6562.43
13

Kannur

70
2308
22365
2624.58
14

Kasaragod

39
1303
9883
608.05
  Total
820
27316
223779
46782.36

Source: Kudumbashree Government of Kerala
Note: LLF taken up in  2006-07

Bala Sabha

During 2004 - 05, Bala Sabha that intends to prevent intergenerational transmission of poverty, has been extended to the rural area also. So far, 41872 balasabhas have been formed with 728978 children.  [Refer Table- 4)

Table - 4
District wise details of Balasabha - Childrens NHG as on 30-09-2007
       2007-08 Cumulative
Sl.No. District
No. of GPs
No. of  Balasabha
No. of Children
No. of  Balasabha
No. of Children
Thrift
(Rs)
1 Thiruvanathapuram
78
513
7216
4176
69582
2095394
2 Kollam
67
187
4045
1651
35348
455547
3 Pathanamthitta
53
722
11495
1946
33290
695332
4 Alappuzha
73
1755
19347
4389
66089
325104
5 Kottayam
75
663
11123
2981
53651
1598920
6 Idukki
50
104
4229
2231
39909
4676932
7 Ernakulam
88
1045
18374
3425
61282
2584318
8 Thrissur
83
394
6260
2478
46243
1281411
9 Palakkad
91
255
5609
3400
58365
1529428
10 Malappuram
100
534
16163
3830
67418
2732561
11 Kozhikkode
78
415
5139
4222
76022
672763
12 Wayanad
25
155
1869
2374
34372
740144
13 Kannur
81
357
6735
2894
53224
1643658
14 Kasargode
39
235
4904
1875
34183
5496031
  Total
981
7334
122508
41872
728978
26527543

Source: Kudumbashree, Government of Kerala

IT Enabled Services to the Poor
An innovative component in the Destitute Identification Rehabilitation and Monitoring project is the online monitoring system built in the project. As per the project, the CDS Office will be computerized in these Panchayats where the destitute rehabilitation project is taken up and the system provided would be best utilized for the benefit of the poor.

Micro Enterprises in Rural Areas
The State budget provides support to set up Micro Enterprises of Women.  It has been set up in the pattern of the SGSY. So far 3165 groups of micro enterprises of women have been set up in the rural areas. The activities are diverse and innovative in nature. Apart from this, about 1155 individual enterprises are also functioning in the rural areas.  [Refer Table - 5 & 6)

Table - 5
District wise details of Rural Micro Enterprises (RME)
Programme- Status of Individual Enterprises as on 31-10-2007
Sl.
No.
District 2007-08 Cumulative
No. of
enterprises
Subsidy
(Rs)
No. of
enterprises
Subsidy
 (Rs)
1

Thiruvananthapuram

1
7500
243
1631400
2

Kollam

1
7500
178
1324500
3

Pathanamthitta

0
0
1
7500
4

Alapuzha

0
0
31
217440
5

Kottayam

8
60000
15
112500
6

Idukki

33
241500
203
1476350
7

Eranakulam

0
0
0
0
8

Thrissur

15
112500
45
330300
9

Palakkad

33
246000
42
312000
10

Malapuram

48
360000
135
941850
11

Kozhikkode

10
75000
122
903000
12

Wayanad

1
7500
6
45000
13

Kannur

6
42000
15
107400
14

Kasargod

27
202500
119
805500
  Total
183
1362000
1155
8214740

Source: Kudumbashree Government of Kerala

 

Table - 6
District wise details of Rural Micro Enterprises (RME)
Programme- Status of Group Enterprises as on 31-10-2007
Sl.
No
District

 2007-08

Cumulative
No. of enterprises
Subsidy
(Rs)
No. of enterprises
Subsidy
 (Rs)
1 Thiruvananthapuram
41
1575000
291
15362469
2 Kollam
34
1140000
223
8667500
3 Pathanamthitta
14
507500
163
5178500
4 Alapuzha
62
2362500
246
10922500
5 Kottayam
55
2120000
101
4600000
6 Idukki
89
3297500
517
24525450
7 Eranakulam
43
2547500
269
14416500
8 Thrissur
30
1304000
195
9437995
9 Palakkad
127
6107500
334
15339750
10 Malapuram
37
1652300
227
14542550
11 Kozhikkode
35
1297500
310
16528500
12 Wayanad
13
522500
59
3240000
13 Kannur
11
510000
115
5447310
14 Kasargod
22
872500
115
5574400
  Total
613
25816300
3165
153783424

Source: Kudumbashree, Government of Kerala

Self Sufficient, Self reliant and Sustainable CDS
The scaling up of Kudumbashree programme to rural areas has been completed and the CDS System is in vogue in all the Grama Panchayats. But still there is a lot to go to achieve the end goal of Kudumbashree. Therefore, it has been decided to develop a few Panchayats, at least one from each District as a model in poverty alleviation. With the objective of total eradication of poverty, the novel programme 'Self sufficient, Self reliant and sustainable CDS' has been launched.

Ashraya - A programme for Community based rehabilitation of destitute families
Ashraya is the first integrated programme for tackling the poorest of the poor who live at the margins of the economy, society and polity without a voice or the power of choice, with no capabilities to access entitlements - the really 'excluded'. It originated from the realization that even in a State like Kerala, the benefits of Anti-Poverty policies and programmes do not reach the absolutely poor, who constitute only about two percent of the population.

As of now, there are no schemes akin to Ashraya in India targeting the poorest of the poor. Thus, Ashraya is a pioneer, developing a model, which can be adapted by the rest of the country. Hence, special support from Government of India is expected.

The key features of the programme 'Ashraya' are:

1. It is a sub - programme of Kudumbashree, the highly successful anti - poverty mission mode
programme implemented through community-based organizations of Kudumbashree. This three - tier network organization include every poor family in the State and each family being represented by a woman.

2. These CBOs identify the poorest of the poor using socially accepted objective indicators of poverty.

3. The Grama Panchayats and Municipalities are the real planners of this project with Government playing the role of an active facilitator.

4. After transparent identification participatory plans are prepared for each destitute family on the basis of close interaction with the family members and on-site verification of details.

5. The plans are implemented by converging services and resources from different sources including PDS, Special Nutrition, Health, Remedial Education, Pensions, Basic Minimum services, Skill Development, etc. Gaps are filled up with funds from Panchayats and Municipalities with the State share being limited to 25% of the project cost or Rs.10 lakhs whichever is lower.

6. The entire programme is monitored regularly. The destitute families would be taken care of till they achieve a minimum standard of life. Thus Ashraya is not one-time assistance but is a promise of continuous support till the objective is realized.
Source: Kudumbashree, Government of Kerala

The destitute identification, rehabilitation and monitoring as a composite programme is an extension of the poverty eradication mission of Kudumbashree through the Community based Organizations of poor. The Mission has rekindled their hope and sensitized the Local Self Government institutions about their new roles in focussed poverty eradication through community development.

The Destitutes 
The destitutes are the poorest of the poor. They are the outliers of the development scenario in the negative extreme. They live at the margins of the economy, society and polity. They do not have a voice or the power of choice. They face the worst forms of deprivation and lack of access to the minimum services. They are exposed to all forms of vulnerability and do not have any safety net against risks. Their income is below subsistence and they are dependent. These faceless, powerless people lack capabilities and are neither aware of their entitlements nor can they access them. They neither compete nor bargain. They drift pushed by circumstances. Severity of destitution is by unfavorable physical gender or caste status. That is, disability being a disabled, being a widow, belonging to a scheduled caste or tribe can singly or in combination aggravate the suffering. The collapse of the traditional social support systems has orphaned the destitutes. They are sometimes objects of charity. But they are never subjects of development. They have to be invested with identity, personality and empowered to stand on their own. Only an Antyodaya approach can reach them. Only care and support can lift them. They can develop only after a period of well - targeted well - designed welfare.

Identification of Destitute families
The destitute families are identified following the 9-point indices developed by the State Poverty Eradication Mission.

Rural
1. No Land /Less than 10 cents of Land
2. No house/Dilapidated House
3. No Sanitary Latrine
4. No access to safe drinking water within 300 meters
5. Women headed house hold/ Presence of a widow, divorcee / abandoned lady/ Unwed mother
6. No regularly employed person in the family
7. Socially Disadvantaged Groups (SC/ST)
8. Presence of Mentally or physically challenged person / chronically ill Member in the family
9. Families with an illiterate adult member

The identification is done transparently through the Neighborhood Groups (NHG) network of Kudumbashree. The members of Neighborhood Groups belong to poor families but need not be destitute. At the same time, since the members of Neighborhood Groups belong to a specific geographical area, they know who all the specified destitute families within their Neighborhood are better than anyone else. The preparation of Micro Plan using the Risk Indices and problem identification mechanism also enables them to identify the destitute families in their vicinity.

Samagra - Local Production Marketing Network
Samagra is an innovative programme independently evolved by Kudumbashree incorporating Rural Business Hub initiative launched by Ministry of Panchayati Raj, Government of India and micro enterprise development activities of Kudumbashree. In general Samagra means comprehensive development job. This is an all inclusive programme encompassing all the components from production to marketing, helping the people involved to derive maximum possible income and thereby improving the returns from livelihood of the people in that area.

This programme is to be implemented by involving all the agencies working in that area under the leadership of the local government with the following objectives:-
• Productivity improvement
• Quality enhancement
• Product diversification
• Ensuring market for the produce
• Increased people participation
• Increased women participation
• Poverty reduction
• Capacity Building

Market Interventions of Kudumbashree
The State Poverty Eradication Mission - Kudumbashree and the Local Self Governments have jointly taken up a comprehensive study during September/October 2006 on the socio economic impact of Micro enterprises created the Local Self Governments and various Government departments and agencies including Kudumbashree. It revealed that in many of the LSGs the marketing of products of Kudumbashree micro enterprises and Kudumbashree NHGs are facing difficulty. The lack of market for the products and the inability to compete against standard products is an important factor on sustainability of the enterprise. To meet this challenge the state Poverty Eradication Mission decided to set up Monthly markets in each district on a specified days and venue. The entrepreneurs are given opportunity to bring their products and directly sell to the customers. It has facilitated increased production and efforts at standardization of product quality and presentation by entrepreneurs. The monthly markets held from October 2007 to December 2007 attracted 2,463 entrepreneurs and had a turnover of Rs. 45,95,838/-. The monthly market of Kudumbashree was begun as a preliminary to the setting up of innovative market centered in each Grama Panchayat/Municipality exclusively for the products of enterprises created under the leadership of LSGs.

Other major Poverty Alleviation Pogrammes
Other major Poverty Reduction Programmes implemented in the state through Panchayat Raj Institutions are Swarnajayanthi Gram Swarozgar Yojana (SGSY), Indira Awas Yojana (IAY), Sampoorna Gramin Rozgar Yojana (SGRY) and Pradhan Mantri Gram Sadak Yojana (PMGSY)

» Swarnajayanti Gram Swarozgar Yojana (SGSY)
The objective of the programme is to provide self employment to the poor establishing a large number of micro enterprises in the rural areas building upon the potential of the rural poor. Emphasis will be given to group approach in this programme. 

(1) The objective of SGSY is to uplift every assisted family above the poverty line within three years time. SGSY is conceived as a holistic programme of micro enterprises covering all aspects of self employment viz. Formation of self-help groups, capacity building, and planning activity clusters infrastructure buildup, technology, credit and marketing.

(2) This Programme will adopt a project approach in each key activity. SGSY is a credit cum subsidy programme where credit forms the critical component. This programme lays emphasis on skill development through training courses. It also proposes to ensure technology up gradation in identified activity clusters. 

(3) Subsidy under SGSY will be uniform at 30% of the project cost subject to maximum of Rs. 7500/-. In respect of SC/STs this will be 50% and Rs. 10,000/-respectively. For group Swarozgaris the subsidy would be at 50% of the project cost subject to per capita subsidy of Rs. 10,000/- of Rs. 1.25 lakhs whichever is less. There will be no limit on subsidy for irrigation projects. The programme expects at least 50% of the Swarozgaris to be SC/STs, 40% to be women and 3% to be disabled.

The allocation and release of the scheme for the years 2006-07 and till the end of November 2007 are indicated below:

Table - 7
Allocation, Release and Expenditure of SGSY
(Amount Rs in Lakhs)
  Allocation Release  
Year
Opening balance
Centre
State
Total
Centre
State
Total
Total fund
Exp
enditure
% of exp.
2006-07
113.15
1996.54
1288
3284.54
1994.78
664.93
2659.71
2773.22
2717.76
98

2007-08
(Nov. 07)

53.29
3042.75
1288
4330.75
1521.38
507.12
2028.50
2081.79
1546.89
74
TOTAL
166.44
5039.29
2576
7615.29
3516.16
1172.05
4688.21
4855.01
4264.65
88

Total amount of subsidy and credit disbursed to SHGs and individual swarozgaris during 2006-07 and up to the month of November 2007-08 are as follows:

Table - 8
Credit and Subsidy Disbursed
  Credit disbursed to (Rs.in Lakhs) Subsidy disbursed to (Rs.in Lakhs)
Year
SHGs
Ind.Swaroz-garis
Total
SHGs
Ind.Swaroz-garis
Total

2006-07

2793.03
1136.89
3929.92
1500.43
485.36
1985.79

2007-08
(Nov. 07)

1922.75
694.44
2617.19
863.68
271.05
1134.73

Total

4715.78
1831.33
6547.11
2364.11
756.41
3120.52

A total numbers of 1395 SHGs, started economic activities, covering 18089 members during 2006-07 and in the case of individual swarozgaries, the coverage is 5022. During the current financial year up to the month of November 2007, 757 enterprises covering 9522 members and 2815 swarozgaris were benefited by the programmes as shown in Table 9.

Table 9
Achievement of SGSY during 2006-07 & 2007-2008 as on November 2007

Year

Self Help Group (No of members covered)

No.of Individual Swarozgaris

 
Total
SC
ST
Women
Disabled
Total
SC
ST
Women
Disabled
2006-07
18089
5898
700
15650
127
5022
4181
268
2322
557
2007-08 (Nov. 07 )
9522
3267
452
7681
156
2815
2183
203
1184
332
TOTAL
27611
9165
1152
23331
283
7837
6364
471
3506
889

Indira Awas Yojana (IAY)

The objective of Indira Awas Yojana is to help construction of dwelling units by members of SC/ST, freed bonded labourers and also non-SC/ST, rural poor below poverty line by providing them with grant-in-aid @ Rs. 27,500/- per house. This is a Centrally Sponsored Scheme sharing cost between Centre and State in the ratio of 75:25. 

The beneficiaries of the scheme are selected by Grama Sabhas, having at least two cents of land for house construction. They should not have dwelling units fit for occupation. The assistance is sanctioned to the female members of the family or in the joint name of husband and wife. House constructed under the scheme should have not less than 20 sq.mts of plinth area but no plans or design is prescribed.

Out of the total allocation for Indira Awas Yojana, up to 20% of the total funds can be utilized for up gradation of existing kutcha houses and towards subsidy for construction of houses with credit from Banks/Financial Institutions. The maximum assistance available is Rs. 12,500/- per family.

The Physical achievements during 2006-07 & up to the month of November 2007-08 are as follows:

Table 10
Physical Achievement under IAY

Year

New houses (Nos)

Upgradation (Nos)

 
SC
ST
Others
Total
SC
ST
Others
Total
2006-07
11898
828
8681
21407
4884
251
3214
8349
2007-08
(Nov. 07)
5806
588
3680
10074
1606
359
1198
3163
TOTAL
17704
1416
12361
31481
6490
610
4412
11512

The allocation and release of the scheme for the years 2006-07 and up to the month of November 2007 are indicated in the table format.

Sampoorna Gramin Rozgar Yojana (SGRY)
This Programme is being implemented as a Centrally Sponsored Scheme on cost sharing basis between Centre and State in the ratio of 75:25.  The Central Government also provides food grain costing equivalent to the cash component, free of cost, additionally.  The objective of the scheme is to provide additional wage employment in the rural areas and also food security - alongwith the creation of durable community, social and economic assets and infrastructure development in the areas.  The works to be taken up would assist in drought proofing such as soil and moisture conservation works, watershed development, promotion of traditional water resources, afforestation and construction of village infrastructure and link roads, primary school buildings, dispensaries, veterinary hospitals, marketing infrastructure and Panchayat ghars.The benefit of the SGRY is made available for all the rural poor who are in need of wage employment and are willing to take up manual or unskilled work in and around his village and habitations.  Preference is given to the poorest among the poor, SC&ST and parents of child labour withdrawn from hazardous occupation.The allocation of funds and food grains to the district is based on two indicators, namely, the proportion of SC/ST population of the district and the inverse of agriculture production per agricultural worker.  Equal weightage is accorded to these two indicators.  Ministry of Rural Development makes the State and district-wise allocation at the Central Level.  Under the Scheme 5 Kg. of Food grains is made available per man-day @ Rs. 8.90/- per Kg for rice and Rs 6.70 for wheat.  The balance wage as per the notified minimum wages is paid in cash.

The allocation and release of funds for the year 2006-07 and up to the month of November 2007 are indicated in the table format

The physical achievements (Mandays generated) for the years 2006-07 and up to the month of October 2007 are indicated below:
Table 13
Mandays Generated under SGRY
SGRY (Lakh Mandays
YEAR
SC
ST
OTHERS
TOTAL
2006-07
19.61
1.70
37.64
58.95
2007-08 (Nov. 07)
14.79
1.09
26.87
42.75
Total
34.40
2.79
64.51
101.70

Financial achievement under SGSY, IAY, JGSY, EAS/SGRY

Pradhan Mantri Gram Sadak Yojana  (PMGSY)
Government of India has launched the Pradhan Mantri Gram Sadak Yojana on 25th December 2000.  The Pradhan Mantri Gram Sadak Yojana (PMGSY) is a 100% Centrally Sponsored Scheme.  50% of the cess on High Speed Diesel (HSD) is earmarked for this Programme.
The primary objective of the PMGSY is to provide connectivity, by way of an All-Weather Road  to the unconnected habitations in the rural areas, in such a say that habitations with a population of 1000 persons and above are covered in three years (2000-2003) and all unconnected habitations with a population of 500 persons and above by the end of the Tenth Plan Period (2007).

A Core Network is that minimal Network of roads (routes) that is essential to provide basic access to essential socio economic services to all eligible habitations in the selected areas through at least single all-weather road connectivity. It should be ensured that each roadwork that is taken up under the PMGSY is part of the Core Network. The PMGSY shall cover only the rural areas. The PMGSY envisages only single road connectivity.

Provision of connectivity to unconnected habitations would be termed as New connectivity.  Up gradation, when permitted would typically involve conversion from Gravel or Water Bound Macadam (WBM) stage to the desired technical specifications or widening of the roads, subject to traffic studies.  Provision of Cross Drainage (CD) works alone would also be treated as up gradation under PMGSY.

Rural Development Department is the nodal agency for implementation of the programme in the State. The programme is under implementation in 55 Blocks spread over all the 14 districts.  PMGSY is a 100% centrally sponsored scheme at present.   Government of India has released Rs 13697.00 lakhs since the inception of the scheme. The total fund available including interest is Rs.13788.56 lakhs. Out of this Rs 11495.09 Lakhs has been spent up to the month of October 2007. 

Scheme under National Rural Employment Guarantee Act- 2005
The National Rural Employment Guarantee Act, 2005 seeks to enhance the livelihood security of the households in rural areas of the country by providing at least one hundred days of guaranteed wage- employment to every house hold whose adult members volunteer to do unskilled manual work.

Every household whose adult members volunteer to do unskilled manual work would be entitled to get registered with the Grama Panchayat and get a job card.  They may submit their names, age and the address of the household to the Grama Panchayat at the village level for issuance of a job card.  It shall be the duty of the Grama Panchayat to register the household, after making such enquiry as it deems fit and issue a job card containing such details of adult members of the household affixing their photographs.

Every registered household would be entitled to at least 100 days guaranteed employment at the wage rate.  The act provides that the wage rate specified from time to time under any such notification shall not be at a rate less than sixty rupees per day.

Every eligible applicant, subject to the household entitlement, is entitled to get work within 15 days for as many days as he/she applies.  Applications for work must be for at least fourteen days of continuous work.  A period of employment shall ordinarily be at least fourteen days continuously with not more than six days in a week.

If the eligible applicant is not provided employment within 15 days of receipt of applications or from the date from which the applicant seeks employment (in the advance applications), he or she shall be entitled to a daily unemployment allowance, in cash.

The central government will provide 90% of funds and State Governments will provide for 10% of the total funds. The details of registration and job cards issued on 2007-08 upto November 2007 are depicted in the table format.

Wages and payments
Not less than Rs. 60 per day per person (the minimum wage in  Kerala is Rs.125). Minimum wages fixed for agricultural labourers by the respective State Governments will be paid as wages under the schemes till such times that the central Governments, specifies wage rate which will not be less than Rs. 60 per day per person.  Wages will be paid fully in cash/partly in cash and partly in kind. However minimum 25% wages shall be paid in cash.  Wages are to be paid on weekly basis and in any case not later than 15 days.

The State Government shall meet the cost of the following:

• The cost of unemployment allowance payable under the scheme.

• 1/4th of the mentioned cost of the scheme including payment of wages to skilled and semi skilled works subject to the provisions of Schedule II of the NREG Act.

• Establish a fund called the State Employment Guarantee Fund.

The EGA is a unique opportunity to activate and empower the Panchayat Raj institution including Grama Panchayat and Grama Sabhas and it will give the scope for meaningful employment generation resulting in reduction of poverty in rural areas.

Employment generation under NREGA...... Refer Table 15 & 16)


The major responsibility for programme implementation has been given to the Panchayat Raj institutions
The NREG Act, 2005 gives priority for water harvesting and water conservation, drought proofing including afforestation and plantation, construction of irrigation canals, micro and minor irrigation works and provision of irrigation facilities to land owned by Scheduled Castes and Scheduled Tribes. Renovation of traditional water bodies, land development and rural connectivity has also to be given priority in the Annual Works Programme that is to be prepared by the implementing agencies.

Government of India issued the notification on 2.2.2006 to launch National Rural Employment Guarantee Act for 200 selected districts in the country. The act will be extended to the whole Kerala by April 2008

Special Features of Kerala implementation

Kerala's approach was 12 - fold as stated below:

(1) 

To mitigate agrarian crisis through eco-restoration initiatives

(2) 

Lead role of PRIs

(3)

To ensure additional income of Rs.12, 500/- per year to any family seeking employment. Every person working under the Scheme shall be entitled to wages at the minimum wage rate fixed by the State Government for agricultural labourers under the Minimum Wages Act, 1948. In the State, the minimum wage fixed is Rs. 125/-

(4)

To eliminate middlemen through
• Wages for the workers paid through individual bank accounts.
• The Area Development Society  provides a Volunteer who helps in organizing the work, ensures proper maintenance of muster rolls and provision of work-site facilities (She steps into the managerial space vacated by the Contractor)
• Estimates discussed up-front with the labour groups
• Estimates in local language exhibited at work sites.
• ADS Volunteer is paid daily minimum wage

(5)

Low priority to roads (only 10 %)

(6)

Gender sensitive planning and implementation leading to empowerment of poor women through
• Equal wages (strategic gender need)
• Managerial roles of ADS volunteer.  She supervises all workers including men (In other work sites men alone are employed as supervisors)
• Work site facilities directly benefit women (gender friendly  work  sites)
• Aya for 5 children below the age of 6 years
• Increased work participation
• Own S.B. account - ownership of one's earnings
• There is positive change in the unequal gender related power equations in work sites.
• Checking of migration of women to cities and other States as maidservants in households, to work in unorganized sector

(7)

Improve common Property Resources thereby helping poverty reduction

(8)

Social security

(9) 

Strengthen livelihood resource base of the poor.

(10)

Fully integrating NREGA with anti poverty programmes

(11)

Convergence with decentralized planning

(12)

Enlarging the scope of NREGA - social security dimensions - campaign against illicit         liquor, thrift promotion etc.


Urban Poverty
As per the National Commission on Urbanization, Poverty cannot be characterized adequately in terms of income, expenditure or consumption pattern alone. The focus should be a human upgradation for reduction of poverty. Thus what is required is a multi dimensional concept inclusive of the environment, access to services and social psychological supports.

High population density of urban area of Kerala has contributed to urban poverty.  This manifests in many forms, such as urban slums, unemployment, lack of social services, and increasing violence and crime.  As per the National Sample Survey Organization (NSSO) from its 61st round survey (2004-05) it is estimated that in Kerala the poverty ratio was 13.2% in rural areas and 20.6 % in urban areas.   The magnitude of urban unemployment is also increasing due to the weak economy. In particular, due to stagnation in manufacturing industry in Kerala, sufficient employment opportunities are not available for the urban dwellers.  National Sample Survey data show that urban unemployment in Kerala is the second highest in India, at 10% in 2000 (only after Goa). Further, due to the rapid increase in land price and construction costs a good number of the urban population in Kerala are forced to live in slums.  The living conditions of slum dwellers are very pathetic.  Drinking water and sanitary facilities are grossly inadequate.  Only one-fourth of households in slums have electricity. The composition of the poor has been changing -while rural poverty is getting concentrated in the agricultural labour and artisan households urban poverty is in the casual labour households.A well-coordinated approach is necessary to reduce urban poverty. For which the following aspects have to be considered seriously.(i) Employment opportunities of a permanent nature need to be made available to the poor both by macro strategies aimed at labour intensive growth and micro strategies to enable the poor to attain the skills needed by the formal and semi formal sectors.  (ii) Self-employment, product development, and marketing. (iii) With the support of urban local bodies and State Government, basic urban infrastructure relating to housing, water supply, sanitation, electricity and roads have to be provided to a minimum standard.  (iv) The access of the poor to quality health and education facilities needs to be ensured, which again calls for improving the service available through hospitals and schools.  Finally, the most vulnerable groups need to be identified through a transparent index.  A robust social protection system has to be set up for them, with a much higher level of support than at present.  Many of these issues will be addressed through the proposed project in the urban sector.Rapid growth of urban population, expansion of existing towns and cities and low investment in urban development have created serious deficiencies in basic amenities especially in the urban areas.  The shortages are serious for the urban poor due to inequality in the access to these amenities.Urban poverty reduction strategies are delivered through major centrally sponsored Urban Poverty Reduction Programmes viz. Swarna Jayanthi Shahari Rozgar Yojana (SJSRY), Integrated Housing and Slum Development Programme (IHSDP) and Basic Services to the Urban Poor (BSUP) implemented by Kudumbashree.  The physical and social developments as well as direct assistance to employment generation are the schemes taken up under these programmes. Kudumbashree has organized Community Based Organizations (CBOs) of the poor in the state. Community Development Societies (CDS) act as delivery system for various Centrally Sponsored Urban Poverty Reduction Programmes. The CDSs has evolved and crafted an innovative methodology for assessing the urban poor.  Every two years, a survey is conducted by using the poverty index following non-economic criteria with nine risk factors reflecting the poverty situations of families.  The neighbourhood community verifies these factors with the identified families.

The nine risk factors of the poverty index in urban area

A family having  

. Less than 5 cents of land/no land

. Dilapidated house/no house

. No sanitary latrine

. No access to safe drinking water within 150 meters

. Women headed household, presence of a widow, divorce, abandoned woman or unwed mother

. No regular employed person in the family

. Socially disadvantaged groups such as Scheduled Castes /Tribes (SC/ST)

. Presence of a Mentally retarded/disabled/chronically ill member in the family

. Families without colour TV

Any family having 4 or more factors is classified as a family at risk.

Source: Kudumbashree, Thiruvananthapuram

Urban Poverty Reduction Programmes

1. Swarna Jayanthi Shahari Rozgar Yojana (SJSRY)
Swarna Jayanthi Shahari Rozgar Yojana (SJSRY) is a Centrally Sponsored Scheme launched in December 1997.  It is shared 75:25 basis by both Central and State Governments. The objective of this integrated poverty alleviation programme is to provide gainful employment to the urban unemployed and under employed poor by setting up of self employment ventures and taking up of wage employment in public works. The programme is being implemented by the Urban Local Bodies through Community Based Organization (CBOs) of the poor.

SJSRY has the following 3 components

(i) Urban Self Employment Programme.  (USEP)
 
 • Assistance for setting up individual enterprises
 
 • Development of Women and Children in Urban Areas.  (DWCUA) - Assistance to Urban Poor Women for setting up group enterprises.
(ii)  Urban Wage Employment Programme.
 
 • Revolving Fund for Women Self Help Groups and Group Enterprises.
 
 • Skill upgradation training, General training, Management of Community  Development Societies.
 
 • Conducting Urban household surveys
(iii) Community Structure.

Urban Self Employment Programame: Urban Self Employment Programame (USEP) assists individual urban poor for setting up gainful self employment ventures. The project cost is Rs. 50,000 per individual but if two or more eligible persons join together in a partnership, higher project cost is allowed, provided individual share does not exceed Rs. 50,000. Subsidy is provided at the rate of 15 % of the project cost subject to a maximum of Rs. 7500 per beneficiary. Beneficiary share is 5% of the project cost either in cash or in kind or both. Out of the total project cost, 80% is sanctioned as loan by financial institutions including Banks and Thrift and Credit Societies. A house to house survey for identification of genuine beneficiaries is being done. Now economic Para methods are to be applied to identify the urban poor. Women beneficiaries belonging to widows, divorcees, single women, where women are the sole earners is to be ranked higher in priority. Not less than 30% of the beneficiaries should be women, 3% to be reserved for disabled and Scheduled Caste / Scheduled Tribe beneficiaries are given special attention in proportion of their strength in the local population.

Development of women and children in urban Areas
Development of women and children in urban Areas (DWCUA) assist the urban poor women for starting gainful employment through group activity. The scheme is extended to the poor women of urban areas who decide to set up self employment enterprise as a group. Minimum number of a group is fixed as 10. The project cost is Rs. 25 lakhs or less. The DWCUA group is given a subsidy of Rs. 1.25 lakh or 50% of the project cost whichever is less. To ensure the contribution of members, 5% of the project cost is brought as their share, either in cash or in kind or as both and 45% of the project cost is as bank loan.

These programmes are being implemented by the Urban Local Bodies through Community Based Organizations (CBOs) of the poor. Community Organizations like Neighborhood Groups (NHGs), Neighborhood Communities (NHCs) and Community Development Societies (CDSs) are set up at the target areas based on the Urban Basic Services for the Poor (UBSP) pattern. Identification of beneficiaries, Selection of Projects for micro enterprises, preparation of application, implementation, monitoring, social audit etc. are done through the community Development Society (CDS) system of the respective Urban Local Bodies.

Kudumbashree has organized Community Based Organization (CBOs) of the poor in all the 53 municipalities and 5 Corporations in the State. There are 13279 Neighborhood Groups (NHGs) covering 347545 BPL families, 1090 Area Development Societies (ADSs) and 59 Community Development Societies (CDSs). The CBOs in the urban areas act also as Thrift and Credit Societies and facilitate savings and credit to the poor. In 2007, the CBOs in urban areas mobilized thrift fund to the tune of Rs. 5232.09 lakhs and disbursed loan worth Rs. 6130.59 lakhs. District wise details of NHGs, ADSs, CDSs and Thrift Fund mobilized are shown here.

Under the SJSRY, so far Kudumbashree have developed 22488 micro enterprises of which 1889 units are group enterprises (each group with minimum 10 women) and 20599 are individual enterprises. Most of the group enterprises are innovative and are owned and operated by the women from poor families. Details of micro enterprises and group enterprises are given in Table 18 and 19.

The activities of group enterprises include solid waste management, computer hardware manufacturing, post-partum care, data entry operation, health care, courier service, remedial education programme etc.

Table 20
Plan Progress of SJSRY (2004-05 to 2007-08)
( Rs in Lakhs)
  Fund Received   % of
Expenditure
Year
Central Share
State share

Total

Funds available including previous year balance

Expenditure
 
2004-05
554.95
175.00
729.95
867.70
480.48
55.37
2005-06
681.26
227.09
908.35
1295.67
792.024
61.12
2006-07

639.22
213.07
852.29
1355.94
951.59
70.18
2007-08
(Up to Dec.2007
not released
not released
-
404.35
428.00*
105.85

Source: Kudumbashree, Thiruvananthapuram
*
Expenditure include ULBs own fund and SJSRY interest fund

Table 21
Physical achievements of SJSRY (2004-05 to 2007-08)
Year
Individual Enterprises Developed
Group Enterprises Developed
Persons Trained
Mandays created under Wage Employment
2004-05
1615
139
4736
16400
2005-06
2055
179
4496
67000
2006-07
2010
241
4731
120800
2007-08 (Up to Dec.2007)
1152
94
1651
13700
Source : Kudumbashree, Thiruvananthapuram

2. Integrated Housing & Slum Development Programme (IHSDP)

Integrated Housing and slums Development Programme (IHSDP) is launched during 2006-07 for housing and infrastructure development in urban slums by combining the centrally sponsored schemes of Valmiki Ambedkar Awas Yojana (VAMBAY) and National Slum Development Programme (NSDP). IHSDP is to be implemented in all towns and cities identified as per 2001 census except cities/towns covered under JNNURM. (Thiruvananthapuram and Kochi corporations)

The basic objective of the scheme is to strive for holistic slum development with a healthy and enabling urban environment by providing adequate shelter and basic infrastructure facilities to the slum dwellers of the identified urban areas. The components for assistance under the scheme will include slum improvement/upgradation/relocation of projects including upgradation/ new construction of houses and infrastructural facilities, like water supply and sewerage. Cost of land for such projects will not be provided under the programme and has to be borne by the State Government. Housing should not be provided as free to the beneficiaries by the State Government. A minimum of 12% beneficiary contribution should be stipulated, which in the case of SC/ST/BC/OBC/PH and other weaker sections shall be 10%. Minimum floor area of dwelling unit is not less than 25 sq.mtrs. Ceiling cost for dwelling unit will be @ Rs.80000 per unit for cities other than those covered under the Jawaharlal Nehru National Urban Renewal Mission (JNNURM).

The funding pattern of IHSDP is 80:20 shared by Central and State Governments. The State share (20%) would be equally shared by (10% each) the State government and the participating Urban Local Self Governments. Kudumbashree is the Nodal Agency for IHSDP. Central assistance released will go directly to the nodal agency as Additional Central Assistance. Release of central share to nodal agency will depend on availability of state share and submission of utilization certificates in accordance with the provisions of General Financial Rules. State share has to be deposited in a separate account to become eligible for the central grant. 50% of the central grant will be released to the State Nodal Agency after verification of the state share and on signing the tripartite Memorandum of Agreement.

During 2006-07, 15 projects were approved by GOI with a total project cost of Rs.6403.12 lakh and for 2007-08, 7 projects were approved with a total project cost of Rs.3918.08 lakh. Details of projects approved by GOI during 2006-07 and 2007-08 are given in Table 22.

Table 22
Details of projects under IHSDP
(Rs.in Lakh)
Sl.No Name of
Local Body
Total Project cost
 State share released to ULB
Central share released
 

2006-07

1

Malappuram

1045.58
52.28
358.109
2

South Paravur

264.32
8.285
122.05
3

Taliparamba

243.43
12.17
105.217
4

Changanassery

347.17
17.36
150.905
5

Mattanur

131.1
6.555
6

Kanhangad

205.72
10.285
97.67
7

Kasaragod

127.54
4.06
8

Kozhikode

696.62
24.88
9

Koyialandy

308.1
8.135
10

Koothuparamba

82.3
3.92
37.42
11

Chittur-Thattamangalam

1230.92
42.325
369.564
12

Kunnamkulam

178.64
8.935
13

Shornur

994.78
49.735
294.398
14

Attingal

156.42
4.62
71.805
15

Thodupuzha

390.48
18.34
172.468
 

Sub Total

6403.12
271.885
1779.606
 

2007-08

1

Alappuzha

1003.85
50.19
NA
2

Ottapalam

898.59
34.16
"
3

Thalassery

189.21
9.115
"
4

Punalur

892.96
40.44
"
5

Perinthalmanna

579.67
25.74
"
6

Chavakkad

158.89
5.415
"
7

Kannur

194.91
8.55
"
 

Sub Total

3918.08
173.61
"
 

Total

10321.2
445.495
1779.606
Source: KSUDP

3. Basic Services to the Urban Poor (BSUP)

Basic Services to the Urban Poor (BSUP) is a sub-component of JNNURM and implemented through Kudumbashree. Thiruvananthapuram and Kochi Corporations alone come under the scheme. The objective of the scheme is to provide basic services to the urban poor viz. housing, solid waste management, water supply, improvement of slums, construction and improvements of drains/storm water drains, sewerage, drainage, street lighting, health care etc.

The financing pattern of BSUP for Thiruvananthapuram is 80:20 and that of Kochi is 50:50 by the Government of India and State Government. Also a minimum share of 10-12% is stipulated as beneficiary share for individual benefits such as housing.

During 2006-07, projects having total cost of Rs.68.94 crore were approved. Of these Rs.42.33 crore is for Thiruvananthapuram and Rs.26.61 crore for Kochi Corporation. In 2007-08 projects having cost of Rs. 125.43 crore is approved for Thiruvananthapuram and Rs.104.45 crore for Kochi Corporation. Details of projects sanctioned under BSUP for the two Corporations during 2006-07 are given in Table 23, 24 and 25)

Table 23
Details of approved projects by Kochi Corporation under BSUP during 2006-07 (Phase I)
(Rs. In lakh)
Sl.No. Project Components
Total project cost
Central share
State share
ULB share
Beneficiary share
1

Housing

a)

New housing(3 colonies-288 houses)

2007.74
1003.87
252.01
b)

New housing-individual houses(Kochi cor.-780, Chellanam GP-245,Kadamakkudy GP-218)

c)

Housing upgradation (197 houses.)

99.68
49.84
2

Community facilites-(Community hall, anganwadi,Pubic toilets, extention of existing buildings)

26.7
13.35
3

Roads

32.04
16.02
4

Solid Waste Management

72.02
36.01
5

Land scaping

1.48
0.74
6

Electrification

12.89
6.45
7

Community buildingsfor relief settlement

325.66
162.83
9

Water supply

83.03
41.52
  Total
2661.24
1330.63
532.25
546.37
252.01

Source: Kudumbashree


Table 24
Details of approved projects by Thiruvananthapuram Corporation under
 BSUP during 2006-07 (Phase I)
(Rs. In lakh)
Sl.No. Project Components
Total project cost
Central share
State share
ULB share
Beneficiary share
1

Housing

30.19
a)

New housing

218.71
174.97
b)

Housing upgradation(107 houses.)

26.75
21.4
2

Community facilites-(Community hall, anganwadi,informal study centre)

61
48.8
3

Roads

19.47
15.58
4

Solid Waste  Management

3.8
3.04
5

Storm water drains

152.7
122.16
6

Electrification

1.96
1.57
7

Sewerage

2.75
2.2
8

Retaining wall,bio fencing land scaping etc

7.8
6.24
9

Water supply

8.3
6.64
  Total
503.24
402.6
50.32
20.14
30.19

Source: Kudumbashree

 

Table 25
Details of approved projects by Thiruvananthapuram Corporation under
 BSUP during 2006-07(Phase II)
(Rs. In lakh)

Sl.No. Project Components
Total project cost
Central share
State share
ULB share
Beneficiary
 share
1

Housing

420.04

a)

New housing( 680nos)

1005.69

804.55

b)

Scattered new housing
-2000 houses(1000 in Tvpm corporation, 250 each in Vattiyoorkavu,Vizhinjam,Kazhakootam and sreekaryam GPs)

2417
1933.6
2

Community facilites-(Community hall, anganwadi,informal study centre)

50.78

40.62

3

Roads

41.69

33.35

4

Solid Waste
 Management

1.91

1.53

5

Storm water drains

113.27

90.62

6

Electrification

6.5

5.2

7

Sewerage

9.14

7.31

8

Generator,bio fencing
land scaping etc

19.29

15.43

9

Water supply

64.13

51.3

 

Total

3729.4

2983.51

174.31

151.53

420.04

Source: Kudumbashree

 

 


 

 